educationcultureCompleted

House of Music Arborea

Arborea, Oristano, Italia2020-2024

The house of music in Arborea repurposes a disused industrial building, transforming it into a new cultural hub through flexible spaces and a distinctive entrance. The project bridges memory and contemporary design, giving the community a new place dedicated to music, gathering, and shared experiences.

The proposed intervention for the Casa della Musica in Arborea stems from the desire to regenerate and repurpose the former “Officine e Case degli Artigiani” (Artisans’ Workshops and Houses), a building with a strong industrial character, located along the town’s main civic services axis.

The understated architectural language and compositional simplicity of the façades inspired a design approach aimed at giving the entire structure renewed semantic and symbolic value, transforming it into a recognizable cultural landmark capable of engaging in dialogue with the surrounding urban context.

The entrance takes on a distinctive and magnetic role: a volumetric void carved into the main building guides visitors from the street into the interior, directing circulation and anticipating the spatial experience. This architectural threshold becomes a welcoming gesture, expressing the building’s new public and cultural identity.

The project restores dignity and meaning to a disused industrial building, redefining its purpose through architecture. From a place of artisanal production to a space for cultural expression, the Casa della Musica emerges as a new civic hub, weaving connections between memory, community, and contemporary life.

The interior spaces described are part of a second phase of the project, already developed during the design process but not yet implemented. The main volume is conceived as a fluid, open space, free from rigid partitions, designed to accommodate a variety of uses and adapt to changing needs. Two partition walls define a transitional space leading to the secondary functions, creating a spatial sequence that alternates openness and thresholds. Their limited height preserves the perception of the hall as a unified space, enhanced by the rhythm of the timber trusses that articulate the roof structure like a suspended musical score.

The secondary wing, accessed through this transitional space, accommodates the supporting functions: administrative offices, individual and group rehearsal rooms designed with particular attention to acoustic insulation, and a service core acting as a circulation hub. Set further back, the auditorium forms the symbolic and functional heart of the project. Conceived as a performance venue, its generous height and seating capacity are designed to offer an immersive and shared cultural experience.

credits

PROJECT
Centro della Musica Arborea
LOCATION
Arborea (OR)
PROGRAM
Edificio Polifunzionale
TEAM
LERUA, Studio CST, Ing. R. Strusi
CLIENT
Unione dei Comuni del Terralbese
AREA
620 m²
PROJECT START
2020
COMPLETION
2024
PHOTO
@Barbara Pau